Architecture BuildingArchitecture Building

    Subscribe to Updates

    Get the latest Architecture and Interior Design News directly to your inbox

    What's Hot

    AN Interior in conversation with Yabu Pushelberg

    March 25, 2023

    Oren Safdie’s latest play debuts this April at Urban Stages

    March 25, 2023

    AN Interior in conversation with Refractory

    March 24, 2023
    Facebook Twitter Instagram
    Trending
    • AN Interior in conversation with Yabu Pushelberg
    • Oren Safdie’s latest play debuts this April at Urban Stages
    • AN Interior in conversation with Refractory
    • Finalists announced for a housing ideas competition in Chicago
    • New York’s historic Flatiron Building sells at auction for $190 million
    • Shigeru Ban creates paper partition shelters for Turkey-Syria earthquake victims
    • BIG designs ‘meandering’ whiskey distillery and new HQ for Blue Run Spirits in Georgetown, Kentucky
    • The Pavilion of the Republic of Kosovo will present rks2 | transcendent locality in Venice Biennale
    Facebook Twitter Instagram
    Architecture BuildingArchitecture Building
    Demo
    • Home
    • Latest News
    • Architecture
    • Interior Design
    • Art
    • Design
    • Urbanism
    Architecture BuildingArchitecture Building
    Home » gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums
    News

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    January 20, 20233 Mins Read
    Facebook Twitter Pinterest LinkedIn WhatsApp Reddit
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The team of von Gerkan, Marg and Partners Archi­tects (gmp) has won an open two-stage competition for the refurbishment and extension of the plaster casting facility of the Berlin State Museums in Berlin, Germany. 

    gmp’s winning design scheme has been conceived to meet listed-building standards. The plaster casting facility of the Berlin State Museums is the largest facility of this kind in the world, as gmp explains. 

    According to the firm, high-quality replicas of pieces of art from museum collections in Berlin and Europe have been produced here for over 200 years. 

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    This means that the plaster casting facility will not only be “a production facility but also will boast a large collection of historic molds and master models of art and cultural objects from all time periods and geographic regions.”

    Due to the current lack of space and the poor condition of the existing building, gmp will now fully refurbish and expand the existing building with a new extension. 

    With this refurbishment and extension, the building will be grown from the current area of about 5,000 square meters to a total of about 13,000 square meters.  

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    Since the competition brief called using sustainable and resource-efficient construction techniques, gmp has decided to implement a low-tech strategy and prioritized robust, low-maintenance solutions over more high-tech technologies.

    The new extension building is connected to the existing facility located on the north of the site. 

    “In terms of urban design, this arrangement provides a convincing solution as the new building resembles the existing facility in its overall volume and – with its L-shaped layout – also blocks off the site towards the west and the urban freeway,” said gmp.

    “In this way, the neighboring residential buildings become part of the newly created urban inner courtyard, and an effective acoustic screening is achieved that blocks noise from the urban freeway and the railway track,” the firm added. 

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    Following the planned low-tech strategy, the layout of functions within the building makes ideal use of the different climate and acoustic zones created.

    The new building will be built from a combination of monolithic insulating concrete walls with a floor/ceiling construction. According to gmp, “this is a modern and economic interpretation of the vault ceilings of the existing building.” 

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    The team provides natural background ventilation without mechanical boosters, using ground heat exchangers and solar chimneys on the roof, thus optimally reducing the energy requirement. 

    Mechanical devices to boost natural air exchange are only used in specific areas in line with special requirements. 

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    In reference to the core activities of the plaster casting facility, gmp will use ultra-lightweight concrete panels on the facade, while the panels are molded and cured material to create a new building sculpture.

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    gmp wins open competition to refurbish and extend plaster casting facility of Berlin State Museums

    gmp completed Chinese Traditional Culture Museum in Beijing, China and completed the new Stade de Luxembourg football and rugby stadium in the south of the city of Luxembourg. 

    All images © gmp Architects.

    > via gmp

    extension
    gmp
    refurbishment

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

    Related Articles

    Shigeru Ban creates paper partition shelters for Turkey-Syria earthquake victims

    March 24, 2023

    BIG designs ‘meandering’ whiskey distillery and new HQ for Blue Run Spirits in Georgetown, Kentucky

    March 24, 2023

    The Pavilion of the Republic of Kosovo will present rks2 | transcendent locality in Venice Biennale

    March 24, 2023

    UIA World Congress of Architects announces its programme for Copenhagen 2023

    March 23, 2023

    Civil Architecture installs a sundial making our sense of time more understandable

    March 23, 2023

    Mjölk Architekti completes gabled roof wooden headquarters addressing sustainable construction

    March 23, 2023
    Top Posts

    Design team selected to reimagine St. Lawrence Centre for the Arts

    March 16, 202310

    UT Austin symposium examines future of architecture and AI

    March 10, 20234

    UAE Welcomes ART From Around the Globe

    December 23, 20223

    Desert X presents 12 installations exploring social and environmental issues in the Coachella Valley

    March 17, 20232
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo

    Subscribe to Updates

    Get the latest Architecture and Interior Design News directly to your inbox

    Don't Miss
    News

    Shigeru Ban creates paper partition shelters for Turkey-Syria earthquake victims

    By adminMarch 24, 20230

    Pritzker Prize-winning architect Shigeru Ban has installed his Paper Partition Shelters (PPS) for the victims…

    BIG designs ‘meandering’ whiskey distillery and new HQ for Blue Run Spirits in Georgetown, Kentucky

    March 24, 2023

    The Pavilion of the Republic of Kosovo will present rks2 | transcendent locality in Venice Biennale

    March 24, 2023

    Progress is underway on memorial for Triangle Shirtwaist Factory fire

    March 23, 2023
    © 2023 Architecture Building. All rights reserved.
    • About
    • Contact
    • Terms
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.